Ski resorts Pacific Coast Ranges
Change lift info:
Pacific Coast Ranges: new lifts 2024/2025
All new lifts in the Pacific Coast Ranges for the 2024/2025 season
Overview: new ski lifts in the Pacific Coast Ranges 2024/2025
New lifts at ski resorts in the Pacific Coast Ranges : renewal of ski lifts or ski resort expansions in the Pacific Coast Ranges
Total: 13
2 10 1
Add lifts and cable cars? Please report here
Pacific Coast Ranges: new ski lifts 2024/2025
- Pacific Coast Ranges – limit to
Mountain ranges: Coast Mountains (3), Cascade Range (2), San Bernardino Mountains (1), Siskiyou Mountains (1)
Pacific Coast Ranges – switch toCountries: USA (51), Canada (14)
Province CAN: British Columbia (4)
States US: California (3), Alaska (3), Washington State (2), Oregon (1)
1-11 out of 11 ski resorts
6pers. High speed chairlift (detachable)
Length: 1414 m
Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
6pers. High speed chairlift (detachable)
Length: 994 m
Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
4pers. High speed chairlift (detachable)
Length: 1600 m
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
4pers. Chairlift (fixed-grip)
Length: 553 m
Carrying capacity/hour: 2400
Manufacturer: Poma
8pers. Gondola lift (monocable circulating ropeway)
6pers. High speed chairlift (detachable)
Carrying capacity/hour: 2800
Manufacturer: Leitner-Poma
4pers. Chairlift (fixed-grip)
Length: 800 m
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
3pers. Chairlift (fixed-grip)
Length: 1000 m
Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
15pers. Pulsed-movement aerial ropeway (gondola)
Carrying capacity/hour: 554
Manufacturer: SSG
3pers. Chairlift (fixed-grip)
Carrying capacity/hour: 1500
Manufacturer: Skytrac Inc.
4pers. High speed chairlift (detachable)
Length: 1600 m
Carrying capacity/hour: 2000
2pers. Chairlift (fixed-grip)
Carrying capacity/hour: 1000
1-11 out of 11 ski resorts